Colorado Aquatics Foundation
A Regional Aquatic & Community Resource
for South Metro Denver
October 2026
Conceptual Rendering
Colorado Aquatics Foundation
Our Mission
Colorado Aquatics Foundation was founded to advance water safety and drowning prevention, expand aquatic access, strengthen aquatic sports, and develop the facilities Colorado communities need.
South Metro Denver lacks sufficient aquatic capacity, particularly facilities providing a configurable 50-meter pool alongside a dedicated warm-water instructional pool for year-round swim instruction, water-safety education, aquatic fitness, rehabilitation and therapy, and community programming.
Founded 2023

Colorado Aquatic Center
Planned at Zebulon Regional Sports Complex
South Metro
Denver
Douglas County • South Metro Denver • Denver Regional Market
Regional Sports Complex
A major Douglas County regional sports campus bringing together athletics, recreation, competition and community use.

Zebulon Regional Sports Complex • ~135-Acre Campus
Douglas County selected Colorado Aquatics Foundation as its aquatics development partner. CAF will independently develop, fund and operate the Colorado Aquatic Center on County-owned property under a planned long-term recreational lease.

The Colorado Aquatic Center is planned alongside ice, court sports, fitness and other recreation within the larger Zebulon building.
Shown in Blue: Planned Colorado Aquatic Center Footprint
Zebulon Building
Douglas County + KT Development
334,131 SF Total
(Main Floor + Mezzanine)
Colorado Aquatic Center
Colorado Aquatics Foundation
35,000+ SF
50m × 25yd Main Pool
Competition + training
4-lane 25yd Warm-Water Pool
Instruction + community programming
The Advantage of Integration
$28–30M
Estimated comparable standalone facility
$11.5–13M
Current CAC project estimate at Zebulon
Integrating the Colorado Aquatic Center into the larger Zebulon development substantially reduces the estimated capital required compared with constructing a comparable standalone aquatic facility.
Standalone comparison is a preliminary rough estimate provided by an aquatic industry professional, not a formal construction bid.

35,000+ SQ FT
4-Lane Warm-Water Pool
Swim Instruction • Water Safety
Therapy & Rehabilitation • Community Programs
50M × 25YD Main Pool
10 long-course / 22 short-course lanes
Movable bulkhead supports simultaneous sports,
training & programming
Two Pools. One Vision.
Built to accommodate competition, training, swim instruction, aquatic therapy, community programming, and public-safety training, often simultaneously.
Conceptual Rendering
Conceptual Rendering

Conceptual Rendering
4-Lane × 25-Yard Warm-Water Instructional Pool
85–86°F • Designed for instruction, therapy and year-round community use
Water Safety
Access & Inclusion
Health & Wellness
Conceptual Rendering

50 M × 25 YD MULTI-USE POOL
One Pool. Multiple Configurations.
A movable bulkhead supports long-course competition, short-course training, and simultaneous aquatic activities, allowing one pool to serve competitive sports and the broader community year-round.
Aquatic Sport
Safety & Public Service
Workforce & Community
Aquatic Sport
Safety & Public Service
Workforce & Community
Conceptual Rendering
A Piece of Swimming History
The 2012 U.S. Olympic Swimming Trials in Omaha marked a defining moment for Colorado’s Missy Franklin, who qualified for her first Olympic Games before winning four gold medals in London.
The Colorado Aquatics Foundation is negotiating the acquisition of the 50-meter Myrtha warm-up pool used at those Trials, with the opportunity to give this historic pool a new home at the Colorado Aquatic Center.
2012 U.S. Olympic Swimming Trials, Omaha
Competition pool installation footage
The footage shows the Trials competition pool. The pool the Colorado Aquatics Foundation is negotiating is the separate 50-meter warm-up pool from the same Trials.
Watch the Installation Time-LapseFirst-responder and recovery agencies are providing input while key design decisions can still be made.

Colorado Parks & Wildlife
Recovery Operations HQ less than 10 minutes away
State personnel training is developed nearby, creating an opportunity for multi-day aquatic recovery-operations clinics serving personnel from across Colorado.

South Metro Fire Rescue
Dive-Rescue & Deep-Water Training
Design consultation focused on dive-rescue training, deep-water access and operational requirements.
Agency input is informing the design
This input is helping inform features including a 12-foot deep-water area, direct exterior access, deck water connections, equipment support and classroom capability.
CAC must advance through design and structural steel during Zebulon’s active development window.

Current Project Estimate
$11.5M–$13M
Full buildout · Three phases
Phase 1 Estimate
$3.2M
Fundraising in progress
Zebulon Site Work
Comparable standalone facility: approximately $28–30M, based on a preliminary aquatic industry professional estimate.
Rough comparative estimate, not a formal construction bid.
Phase 1 · 2026
Design, permitting, complete custom structural-steel order
Phase 2 · 2027
Shell construction, partial HVAC, shared systems
Phase 3 · 2028
Interior buildout
January 2029
Target opening
Current planning targets; schedule and costs remain subject to design and development.
Regional Impact
The Colorado Aquatic Center would expand year-round aquatic access in South Metro Denver while adding a new regional venue for competitions, training camps, statewide clinics, and events that bring athletes, families, and visitors to local businesses.
Competition & Events
550 spectator seats
Camps & Clinics
Multi-day training camps
The Zebulon Effect
135-acre multi-sport campus
A year-round community resource with the capacity to host regional competitions, statewide training, and events that bring visitors to South Metro Denver.
Leadership
Colorado Aquatics Foundation is guided by a board of directors and advisory committee bringing experience in aquatic sports, business, and community development as the Colorado Aquatic Center moves toward construction.
Board of Directors
Jerrod Brown
President & Co-Founder
USA Swimming Official · Aces Swim Club Parent · Land Development Background
Matt Flavin
Co-Founder
Energy Sector Executive · Former Naval Officer · Aces Swim Club Parent
Anna Boyd
Co-Founder
Real Estate Professional · Coach · Avon Swim Club Parent
Advisory Committee
Tom Byorick
Head Coach & Owner · Aces Swim Club
Brett Kelley
Age Group Coach · Aces Swim Club
Joel Shinofield
Managing Director of Sport Development · USA Swimming
Mark Heydt
Founder · Stoke Leadership · 40+ Years in Colorado Swimming
Experience Guiding the Project
CAF’s board and advisory committee bring experience in aquatic sports, business, land development, and community leadership as the Colorado Aquatic Center advances toward development.
A new aquatic resource designed to expand access, advance water safety, support aquatic sport, and serve Colorado communities for generations.
01
Advancing drowning prevention through learn-to-swim programs, water-safety education, and lifeguard training that help keep children and families safer around water.
02
Expanding opportunities to learn and heal through aquatic therapy, rehabilitation, adaptive programs, early intervention, and fitness for people of all ages and abilities.
03
Creating space for athletes to train and compete, and for families, teams, and communities to come together year-round, all in one place.

Jerrod Brown
President & Co-Founder
jerrod@coloradoaquatics.org · (720) 509-9229
coloradoaquatics.org